Copeland Compressor ZBD21KCE-TF5-940 Digital Scroll Compressor 200/230V 3-Phase

Copeland Compressor ZBD21KCE-TF5-940 Digital Scroll Compressor 200/230V 3-Phase
Images for general purposes only. Actual may be different than depicted.
Copeland Compressor ZBD21KCE-TF5-940 Digital Scroll Compressor 200/230V 3-Phase

Copeland Compressor ZBD21KCE-TF5-940 Digital Scroll Compressor 200/230V 3-Phase

SKU: ZBD21KCE-TF5-940
Rating:
Quantity Price Stock
Usually Ships 2 - 4 Weeks
Usually Ships 2 - 4 Weeks
$6,115.50     /ea
Usually Ships 2 - 4 Weeks

Shipping Note

Ships via LTL ( Truck )

0
$0.00
0
$0.00
0
ZBD21KCE-TF5-940
The ZBD21KCE-TF5-940 is a digital scroll compressor that has a power rating of 3HP, 200 to 230V, and 60 Hz frequency.  It has a 1-1/4" and 1" rotalock connection sizes with 16,800 to 33,500 BTU cooling capacity.

The three-phase digital scroll compressor is suitable for medium-temperature applications.  The unit features up to 7.7 EER cooling efficiency with excellent isentropic and liquid handling capability.

Check out the compatible refrigerants:
 
  • R404A
  • R407A
  • R407C
  • R407F
  • R448A
  • R449A
  • R507
The ZBD21KCE-TF5-940 is quick and easy to install with lightweight and sturdy construction.
Refrigeration Types R-404A, R-407A, R-407C, R-407F, R-448A, R-449A, and R-507
Voltage 200 to 230V
Cooling Efficiency Up to 7.7 EER
Applications Medium Temperature
Capacity Range 16,800-33,500 BTU
Number of Phases Three-Phase
Frequency 60 Hz

Q & A: Ask the Questions, share answers

Do you have questions about this product?


Q: 
1)Is it for 3P/220V/60HZ? 2)Is it an available product?
Asked on July 09, 2020 by WEI YI from Taiwan
1 Answers

Have an answer? Click Here

A: 
The compressor can operate with the following electrical specifications:
  • Voltage@Hz
    • 200/220 V @ 50 Hz
    • 200/230 V @ 60 Hz
  • Phase
    • 3 Phase
Currently, it is not in stock and at time of writing, lead time is approx 2 -3 weeks; however may vary slightly.

 
Replied on July 10, 2020 by Ori from Industrial Stores