| Cooling stages | 4 |
|---|---|
| Frequency | 50/60 Hz |
| Heating stages (configured for A/C with electric heat): | 2 |
| Heating stages (configured for Heat Pump): | 4 |
| Operating Temperature | 0 to 120°F (-18 to 49°C) |
| Voltage | 18 to 32V |
| Temperature Accuracy | +/- 1F from 60 to 85°F (16 to 30°C) |
| Approvals | FCC, ETL, CE, and CSA certified |
| Lead/Lag Changeover Time | 0 to 30 days |
| Amperage | 1A |
Download Product Information:
Bard HVAC MC4002-B Lead/Lag Controller Installation Instructions
Q & A: Ask the Questions, share answers
Do you have questions about this product?
Have an answer? Click Here